Home | Hallway Lighting | Open Floor Plan | Man Cave
Track lighting to be removed
Installing can lighting
TV wall mount with outlet
Custom Shelf
Carpet to be replaced
Preparation for new floor covering
Installing laminate flooring
Installed surround sound system
Completed Room
Window before trim is added.
Finish before painting
Final window trim and window covering